theshop [2018/03/28 18:51]
zashi
theshop [2018/10/02 16:53]
zashi [Phase 6: Power]
Line 28: Line 28:
  
 ==== Phase 1: Land Prep ==== ==== Phase 1: Land Prep ====
 +
 +**DONE**
  
 The area where the workshop is going to go needs to be prepped. All the cedar trees need to be taken down. Stumps need to be dug out and removed. Any smaller woody plants need to be removed. The land needs to be leveled and raised a little. The area where the workshop is going to go needs to be prepped. All the cedar trees need to be taken down. Stumps need to be dug out and removed. Any smaller woody plants need to be removed. The land needs to be leveled and raised a little.
Line 39: Line 41:
  
 ==== Phase 3: Slab ==== ==== Phase 3: Slab ====
 +
 +**DONE**
  
 Have the slab poured. Have the slab poured.
Line 44: Line 48:
 ==== Phase 4: Building Erection ==== ==== Phase 4: Building Erection ====
  
-Choice Metal Buildings delivers and erects buildings purchased through them.+<del>Choice Metal Buildings delivers and erects buildings purchased through them.</​del>​ 
 + 
 +Order placed through Alan's Factory Outlet
  
 ==== Phase 5: Framing ==== ==== Phase 5: Framing ====
Line 59: Line 65:
  
 Along with running power, a few cat-5e cables could be ran from the house to the workshop for network connectivity as well as other communication (e.g. analaog audio). Along with running power, a few cat-5e cables could be ran from the house to the workshop for network connectivity as well as other communication (e.g. analaog audio).
 +
 +=== Code Requirements ===
 +
 +''​Accessory structures must provide at least 60A service. Exceptions to the 60A minimum exist for one- and two- circuit service to accessory structures.''​
 +
 +A 20A circuit could be provided for lights + computer/​electronic equipment and a second 20A circuit could be for powertools, of which no more than 2 at any time would operate (shopvac + larger tool).
 +
 +Regardless of whether code says I need a dedicated grounding rod + ground loop, I will install one.
 +
  
 ==== Phase 7: Insulation ==== ==== Phase 7: Insulation ====
Line 130: Line 145:
  
  ​* ​ 500 sqft (25x20)  ​* ​ 500 sqft (25x20)
-| Permit | $250| +^ ITEM ^ EST ^ ACTUAL ^ 
-| Ground Clearing | $?| +| Permit | $250|  
-| Slab | $3500+| Ground Clearing | $?| $0
-| Building | $7960.00| +| Slab | $3,500| $3,500
-^ Total ^ $11,710.00^+| Building | $7,960.00| $7,981
 +^ Total ^ $11,710.00^ $11,481^