Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
temple [2015/06/25 13:16] zashi [Big stuff] |
temple [2015/10/04 19:20] (current) hannah [Big stuff] |
||
---|---|---|---|
Line 11: | Line 11: | ||
* Rug <- will probably move the rug from the living room and buy a new rug | * Rug <- will probably move the rug from the living room and buy a new rug | ||
* Finish fixing the shelves (they're fixed and I don't want to waste any more time or money patching the old shelves... eventually they will be rebuilt entirely) | * Finish fixing the shelves (they're fixed and I don't want to waste any more time or money patching the old shelves... eventually they will be rebuilt entirely) | ||
- | * Drink Fridge | + | * <del>Drink Fridge</del> (Picked out and installed spring 2015) |
* Finish Freezer Cabinet | * Finish Freezer Cabinet | ||
* Freezer | * Freezer | ||
- | * Replace Mailbox + mailbox numbers | + | * <del>Replace Mailbox + mailbox numbers</del> (Completed summer 2015) |
* Double-decker under-cabinet gliders; move the current ones to under the bar. | * Double-decker under-cabinet gliders; move the current ones to under the bar. | ||
* Wiring for garbage disposal | * Wiring for garbage disposal | ||
Line 34: | Line 34: | ||
* French Doors for the library | * French Doors for the library | ||
* Crown Molding everywhere (possibly done in patches as part of other reno work) | * Crown Molding everywhere (possibly done in patches as part of other reno work) | ||
+ | * Renovate office | ||
+ | * Upper cabinetry | ||
+ | * Desk for Hannah | ||
+ | * Shelf and tech movement | ||
* <del>New car for Hannah (ETA 2017?)</del> Car died October 2014; Replacement immediately bought. | * <del>New car for Hannah (ETA 2017?)</del> Car died October 2014; Replacement immediately bought. | ||
Line 62: | Line 66: | ||
* Remove the old decking. Build a deck that spans between the kitchen and library doors. Build a screened in area around the library area. Replace the back doors with french doors. | * Remove the old decking. Build a deck that spans between the kitchen and library doors. Build a screened in area around the library area. Replace the back doors with french doors. | ||
+ | |||
+ | * Office | ||
+ | * Create a more organized and compatible space in the library where both Hannah and I can work, plus that is slightly more kid friendly | ||
+ | * Upper cabinetry to be mostly salvaged from Habitat, with supplimentary pieces from Target, Lowes, etc | ||
+ | * Draft of primary changes can be seen [[http://i.imgur.com/eB0o0dM.png|here]] | ||
+ | * Extra projects include: | ||
+ | * Convert "bench for sitting" into [[http://sewmanyways.blogspot.com/2012/01/tool-time-tuesdayfile-your-fabric.html|fabric filer]] | ||
+ | * Make extra-thick padded cover for folding tables that can be used for cutting and ironing during sewing projects | ||
+ | * Refinish armoire and move in for extra storage | ||
===== Projects ===== | ===== Projects ===== | ||